Repair works of the leaking pipe by AVIDA Waterworks through its contractor, A.C.. Lazaga from July 9 to 13, 2008. We have allowed the contractor to work on Sunday (July 13) purposely for the backfilling and restoration of the pavement. Curing of the concrete is from July 14 to 20.
Minor leak repairs are also scheduled in different areas which will be done by the maintenance crew of AVIDA in the next two weeks. Please report to the Administration Office other leaks that you may observed in your respective areas so we can include them in the list for repair works.
MEDICAL MISSION SATURDAY, JULY 12, 2008 BETWEEN 8:00am - 12:00n n AT THE BARANGAY HALL OF BIÑAN.
Free consultation and medicine.
Medical practitioners and specialist - internal medicine, pediatrician, OB, EENT Surgeon and R.O.D
Laboratories available - Hemo glucose test (HGT), blood typing (BT), pregnancy test (PT), urinalysis (UA), fecalysis(FA), hepa B screning, x-ray
Please advise the Barangay through mobile no. 0910 892 56 20 of your participation on Sta. for its headcount.
0 comments:
Post a Comment